Iron Works Creek Sidewalk
Project Summary
This project will install sidewalks on Second Street Pike between Tanyard Road and Crossroads Plaza Drive, and includes a pedestrian bridge over Iron Works Creek. It will complete sidewalk connections from Manor Drive to Tanyard Road through the Village of Richboro.
The Township completed preliminary engineering design in 2021 at a cost of $230,000 and secured a $1.4 Million grant for construction. The estimated bid date for this project is December 2024. The estimated project cost is $1.6 Million. The Township is responsible for the cost for construction inspection estimated at $190,000.