Skip to content
How Do I...?

Route 332 Trail Connection

Project Summary

There are two proposed projects to construct pedestrian trails along Newtown-Richboro Road.  

The first project involves construction of a walking trail from St. Leonard’s Road to Tyler State Park.  The trail would connect to the Park using an existing pedestrian walkway under the bridge over the Neshaminy Creek. The project will also provide a connection to the planned Neshaminy Greenway Trail.  Engineering design and permitting at an estimated cost of $225,000 is underway, The Township received an $825,000 grant for construction, which is anticipated to begin in 2026. 

The second project involves construction of a walking trail from Rock Way to St. Leonard’s Road that will connect to an existing sidewalk to the west.  The Township was awarded a $500,000 grant for construction. Engineering design is underway at a cost of $85,000.  The estimated bid date for this project is September 2025.  The estimated construction cost is $500,000.

Trail Connection from Rock Way to Tyler Park

Trail Connection from Rock Way to Tyler Park